top of page

PROVINCIAL HOSPITAL

Provinical_Demo.jpg

Provincial Hospital is established as a newly built complex.
The Hospital design solutions will provide implementation of the modern medical technologies, advanced resource saving, non waste and low waste technologies.

Construction principle

Pre- fabricated steel structure with modular construction. The Hospital will be designed in detached one-story buildings.

Construction-1.jpg
Construction-2.jpg
Construction-3.jpg

120 BEDS LAYOUT OPTION FOR A PROVINCIAL HOSPITAL

The project schedules the structural divisions for carrying out diagnostics, treatment and the premises of laundry, cooking department, central sterilization and medical gases central station.

  • 4 emergency beds

  • 4 trauma beds

  • 4 IC beds

  • 4 labor beds

  • 4 recovery beds

  • 4 neonatal IC beds

  • 96 patient beds

(16 beds in every patient department and 24 special care beds)

TOTAL: 120 Beds

Picture9b.png
slide7.jpg

Provincial Hospital  Layout Sample

Provincial Hospital will consist of the following functional elements:

mapppp.jpg

Sample Layout

  • Operating block

  • ICU

  • Accident and Emergency unit

  • Polyclinic block

  • Diagnostic Department

  • Laboratory Unit

  • Labor/Delivery Unit

  • Patient Department (x 6)

  • Laundry unit

  • Sterilization Department

  • Kitchen

  • Pharmacy

  • Administration

  • Technical unit

  • Personal Unit (x 3)

Provincial Hospital Projects:
Texas / Uzbekistan / Ecuador 

Sheep in Open Fields

OUR REQUIREMENTS

  • A land plot with an area of at least 1.0 –1.5 Hectare for the Hospital establishment

  • Technical information regarding the construction site necessary for the object design (plot plan, plot boundaries, situational plan, topographic plan, etc.)

  • Site prepared for construction including its improvement

  • Connection to electricity, water and sewerage

  • Deliver the cargo from the Port to the Hospital area

  • Clear the goods from customs and pay taxes, if necessary

TURN KEY SOLUTION

Our turn key solution includes:

  • Design work 

  • One year warranty for the medical and technological equipment

  • All the necessary medical and technological equipment 

  • All necessary furniture

  • Construction materials

  • Construction and installation works

  • Training of the customer's technical staff to handle the technological and medical equipment and systems  

  • Consumables for 2 month of work

  • Pre-sale and post-assembly tests

  • Delivery within 9 -12 months

Hospital Staff

Contact us for more info:

Thanks for submitting!

bottom of page